Close Menu
    • Home
    • Contact Us
    Gulf MNGulf MN
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Gulf MNGulf MN
    Home » ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project
    Business

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development Project

    July 27, 2022
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    In connection with the Hail and Ghasha Development Project, Abu Dhabi National Oil Company (ADNOC) announced the award of two large contracts totaling $2 billion (AED7.49 billion) to ADNOC Drilling. A total of $1.3 billion (AED4.89 billion) will be spent on integrated drilling services and fluids, and $711 million (AED2.6 billion) will be spent on providing four Island Drilling Units. ADNOC Logistics & Services was also awarded a third contract for offshore logistics and marine support services valued at $681 million (AED2.5 billion).

    ADNOC Drilling awarded $2 billion for the Hail, Ghasha Development ProjectIn total, more than 80% of the awards will flow back into the UAE’s economy as part of ADNOC’s successful In-Country Value (ICV) program. Each of the three contracts covers the Hail and Ghasha drilling campaign for a maximum of ten years. This project is part of the Ghasha Concession, which is the world’s largest offshore sour gas development and an important component of ADNOC’s integrated gas masterplan as well as an important enabler of UAE gas self-sufficiency.

    With the expansion of ADNOC’s liquified natural gas (LNG) capacity, ADNOC’s gas masterplan ensures a sustainable and economical supply of natural gas to meet the growing demands of the UAE and international markets. As part of the plan, new approaches and technologies will be applied to increase and improve gas recovery from existing fields, as well as develop untapped resources and leverage innovation to reduce emissions over time.

    Natural gas production from the Ghasha Concession is expected to begin around 2025, ramping up to over 1.5 billion standard cubic feet per day (SCFD) by the end of the decade. A total of four artificial islands have already been completed, and development drilling is underway. As part of the Ghasha Concession, ADNOC and its partners awarded two Engineering, Procurement & Construction (EPC) contracts last November. For the Hail and Ghasha project, they also awarded a contract for updating Front-End Engineering and Design (FEED). By the end of the year, the updated design will further optimize costs and timing, as well as potentially accelerate carbon capture integration.

    Related Posts

    Russia and Oman trade hits 10-year high at $1.5 billion

    October 23, 2026

    Japan exports rise for 13th month as imports grow faster

    October 23, 2026

    South Korea chip exports surge 222.5% in early October

    October 22, 2026

    Oil prices hit $110 a barrel on Middle East supply fears

    October 17, 2026

    Egypt remittances hit record $33.9 billion in eight months

    October 16, 2026

    Oman power output rises while water production falls

    October 12, 2026
    Latest News

    Russia and Oman trade hits 10-year high at $1.5 billion

    October 23, 2026

    Magnitude 7 earthquake in Tibet kills 16 and injures dozens

    October 23, 2026

    Japan exports rise for 13th month as imports grow faster

    October 23, 2026

    SGU urges risk-based breast cancer screening in Africa

    October 22, 2026

    Abu Dhabi Crown Prince arrives in Athens for official visit

    October 22, 2026

    South Korea chip exports surge 222.5% in early October

    October 22, 2026

    Russian, Chinese scientists develop ultrasonic welding method

    October 21, 2026

    Türkiye targets $70 billion in tourism revenue in 2027

    October 21, 2026
    © 2026 Gulf MN | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.